The old ditch in Yixing Street is improved. Siltation is easy to flood.

https://www.zincheng.com.tw/dt05.htm

The drainage ditch of Yixing Street in Yixing Street has a history of about 40 years. It has been repaired and repaired. It is not only muddy, but also the ditch cover is damaged. It is easy to accumulate water in the rainy days, causing public grievances. Therefore, after receiving the feelings, today ( 21) The Japanese City Council member Zhou Yaling Service Department invited the relevant units to conduct on-site meetings and requested improvement. There are 20 apartments in Yixing Street, both sides are traditional apartments, and the ditch on both sides is also because of the age, not only the damage of the ditch cover, but also the accumulation of a lot of silt at the bottom of the ditch. The ditch becomes shallow as long as the rain will accumulate. The similar situation includes the entire 4 lanes of Yixing Street, which makes the place very troublesome. Yixing Lichang Chen Qingxi said that because we have not rectified in Yixingli for about 20 years, the ditch has been broken, the silt is very thick, and the ditch is shallow and the rain is easy to flood, so many people have to sort out the reaction. I was hoping to do it all at once, but because of the problems of the public funds, it’s possible to do it in stages. City Councilor Zhou Yaling, Director of the Service Department, Lin Sanji, said that there are 10 lanes, 20 lanes, 30 lanes to 40 lanes in Yixing Street. Because the drainage ditch has a history of more than 40 years, the years of disrepair and many miscellaneous items will accumulate. At the bottom of the ditch, every heavy rain will be flooded, and the ditch cover will also be ruined. It is also dangerous for pedestrians, including dredging and dredging, and the entire cover should be arranged. In the case of limited public funds, The segmentation is gradually improved.

arrow
arrow
    全站熱搜

    vinniboy 發表在 痞客邦 留言(0) 人氣()